OEMer Utilities

STATEMENT OF PURPOSE®

AlfaOEMer PARTNERSHIP PROMISE™

ADDC E-COMMERCE MOBILIZATION DESIGN SERVICES

AlfaOEMer MSO™ THE MACHINE
     
PROJECT MANAGEMENT
     QUALITY CONTROL
     
SUPPLIER EVALUATION
     
PRODUCT SOURCING

       

       

 

   It Is AlfaOEM Only
It's state-of-Art Technology,  Business and services!

Proven Savings by Real Life Over 25%
Our extensive infrastructure and factory-direct model, combined with volume leverage, Cost down analysis, deliver proven cost savings to your bottom line
                          
3.2M  CCM Cost Down  Proven save up to 25%  
  Before After Save US$ Percentage Remark
LENS 2.95 2.75 0.2000 7.2727  
SENSOR MI3120 7.8 7 0.8000 11.4286  
VCM MODULE 3.6 3 0.6000 20.0000  
CONNECT 0.4 0.3 0.1000 33.3333  
VCM DRIVER 0.63 0.33 0.3000 90.9091  
CAPACITOR 0.12 0.06 0.0600 100.0000  
FPCB 0.6 0.3 0.3000 100.0000  
SMD 0.35 0.15 0.2000 133.3333  
PACKAGING 0.15 0.08 0.0700 87.5000  
           
Materal Sub-Total 16.6 13.97 2.6300 18.8261  
           
Overhead 5% 17.43 14.1097 3.3203 23.5320 1%
Labor / 6minutes 0.822857 0.48 0.3429 71.4286  
Total Net Cost:  18.25286 14.5897 3.6632 25.1078  



Brand Equity

Whether your needs are for creative solutions from our innovative design team or efficient development of your own product ideas, we understand brand equity and have developed many top-selling products for clients' core brands and private label programs


Quality Control Throughout

We design quality into your products starting with in-depth supplier qualification and detailed product engineering by in-house teams, QC Teams then inspect your order in-process and each shipment is inspected prior to shipping

Productivity
Fortune 500 companies and small businesses alike trust AlfaOEM to increase their productivity by making importing simpler and removing the fear and obstacles standing in the way of going factory-direct
AlfaIPcam M6843 Project Management
Model No Item No. q'ty          
AlfaIPcam M6843 M6843 15000          
    Partial  MP          
    4000          
               
Schedule Elec. Parts SMT Ready Major Parts Assembly Packing Final Testing D Day
Required q'ty 15000 15000 4000 4000 4000 4000 4000
Day of Complete 03/19 03/24 03/26 03/27 03/28 03/29 03/28
MP q'ty     4000 4000 4000 4000 4000
               
               
RemarkParts and SMT need to be completed on D day for AlfaOEMer visit and inspection
  Visiting Schedule          
  SMT Process 2008/03/21 & 22        
  Assembly line 2008/03/27 & 28        
        Total of 8 assembly line out of 860 pcs Ea. (8hrs)    

Ownership Culture
Our management team is energetic, experienced, passionate and detail oriented. AlfaOEM is financially stable; the kind of partner you want managing your import programs

Open, Honest Communication
We do not hide problems; our clients receive truthful and dependable updates and reports at all times, without exception

We Deliver
AlfaOEM has never failed to deliver on a committed program for a client

 

 

 

TEl: +886-33974444
FAX: +886-33974210
E-mail:
sales@alfaoem.com

 
CopyRight © 2004-2005 Alfaoem Inc.