|
It Is AlfaOEM Only
It's state-of-Art Technology,
Business and services!

Proven Savings by Real Life Over
25%
Our extensive infrastructure and factory-direct model, combined
with volume leverage, Cost down analysis, deliver proven cost savings to your
bottom line
|
3.2M CCM Cost Down |
Proven save up to 25% |
|
|
|
Before |
After |
Save US$ |
Percentage |
Remark |
|
LENS |
2.95 |
2.75 |
0.2000 |
7.2727
|
|
|
SENSOR MI3120 |
7.8 |
7 |
0.8000 |
11.4286
|
|
|
VCM MODULE |
3.6 |
3 |
0.6000 |
20.0000 |
|
|
CONNECT |
0.4 |
0.3 |
0.1000 |
33.3333
|
|
|
VCM DRIVER |
0.63 |
0.33 |
0.3000 |
90.9091
|
|
|
CAPACITOR |
0.12 |
0.06 |
0.0600 |
100.0000 |
|
|
FPCB |
0.6 |
0.3 |
0.3000 |
100.0000 |
|
|
SMD |
0.35 |
0.15 |
0.2000 |
133.3333
|
|
|
PACKAGING |
0.15 |
0.08 |
0.0700 |
87.5000 |
|
|
|
|
|
|
|
|
|
Materal Sub-Total |
16.6 |
13.97 |
2.6300 |
18.8261
|
|
|
|
|
|
|
|
|
|
Overhead 5% |
17.43 |
14.1097 |
3.3203
|
23.5320
|
1% |
|
Labor / 6minutes |
0.822857 |
0.48 |
0.3429
|
71.4286
|
|
|
Total Net Cost: |
18.25286 |
14.5897 |
3.6632
|
25.1078
|
|
Brand Equity
Whether your needs are for creative solutions from our innovative
design team or efficient development of your own product ideas,
we understand brand equity and have developed many top-selling
products for clients' core brands and private label programs
Quality Control Throughout
We design quality into your products starting with in-depth
supplier qualification and detailed product engineering by
in-house teams, QC Teams then inspect your order in-process
and each shipment is inspected prior to shipping
Productivity
Fortune 500 companies and small businesses alike trust
AlfaOEM to increase their productivity by making importing
simpler and removing the fear and obstacles standing in the
way of going factory-direct
|
AlfaIPcam M6843 Project Management |
|
Model No |
Item No. |
q'ty |
|
|
|
|
|
|
AlfaIPcam M6843 |
M6843 |
15000 |
|
|
|
|
|
|
|
|
Partial MP |
|
|
|
|
|
|
|
|
4000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Schedule |
Elec. Parts |
SMT Ready |
Major Parts |
Assembly |
Packing |
Final Testing |
D Day |
|
Required q'ty |
15000 |
15000 |
4000 |
4000 |
4000 |
4000 |
4000 |
|
Day of Complete |
03/19 |
03/24 |
03/26 |
03/27 |
03/28 |
03/29 |
03/28 |
|
MP q'ty |
|
|
4000 |
4000 |
4000 |
4000 |
4000 |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
Remark:Parts
and SMT need to be completed on D day for AlfaOEMer
visit and inspection |
| |
Visiting Schedule |
|
|
|
|
|
| |
SMT Process |
2008/03/21 & 22 |
|
|
|
|
| |
Assembly line |
2008/03/27 & 28 |
|
|
|
|
|
Total of 8 assembly line
out of 860 pcs Ea. (8hrs) |
|
|
Ownership Culture
Our management team is energetic, experienced, passionate
and detail oriented. AlfaOEM is financially stable; the
kind of partner you want managing your import programs
Open, Honest Communication
We do not hide problems; our clients receive truthful and
dependable updates and reports at all times, without exception
We Deliver
AlfaOEM has never failed to deliver on a committed program
for a client |